Construction of BER pavilions completed

Published on : Thursday, June 4, 2015

FBBThis week, Flughafen Berlin Brandenburg GmbH completed the construction of the two 14,000-square-metre pavilions located to the left and right of the main terminal. The completion of this stage of the remaining work for the airport provides additional terminal space. The two buildings have eight security lines each and twelve check-in counters which are connected to the BER baggage handling system.

 

 

The technical commissioning of the two pavilions will take place when the terminal opens. Work is currently underway to provide an additional “premium check-in” facility requested by one airline in the South Pavilion and ensuring that the metering points on specific cables comply with the standardised labelling throughout BER.

 

 

Source:- Flughafen Berlin Brandenburg

Tags: , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  stumbleupon-logo   rss_logo 
ttw_blogger_logo  ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 01 AIME 2018 BB
  • 02 WTM 2017
  • 03 EMITT 2018
  • 04 AIME-2018 small
  • 05 iitmindia 2017
  • 06 imtm 2018
  • 06 TTF-Surat 2017
  • 07 balttour 2018
  • 08 OTM 2018
  • 30 PATA

TRAVEL INDUSTRY EVENTS

Get our toolbar!
Review www.travelandtourworld.com on alexa.com