Engineers Working to Clear Winchburgh Tunnel Flooding

Published on : Friday, August 9, 2019

Network RailNetwork Rail engineers have been on-site throughout the day working to clear over 2ft of flood water from Winchburgh Tunnel in West Lothian.

 

 

More than 50mm of rain fell in just over an hour on Wednesday night, filling the tunnel with water and overwhelming its drainage systems.

 

 

Network Rail engineers, assisted by the Scottish Fire and Rescue Service, are working to clear the standing water from the tunnel and overnight inspections will take place to check the track and signalling for any damage.

 

 

Train service are expected to resume through Winchburgh Tunnel from Friday morning and customers should check their journey at National Rail Enquiries.

 

 

Liam Sumpter, Route Director for Network Rail Scotland, said: “We are working as quickly as possible to reduce the water levels so we can inspect the tracks for damage and clear out any sludge or debris that may affect the signalling systems.

 

 

“We’re sorry for the inconvenience this incident has caused our customers and will get services back on the move as soon as possible.”

 

Source:- Network Rail

Related Posts

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  rss_logo 
ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 20 RAM20
  • 21 ameistanbul 2020
  • 22 BLTM Banner 2020
  • 22 iitm 2020
  • 23 Emitt 2020
  • 24 OTM-Banner 2020
  • 25 aviation-festival-asia 2020
  • 25 fitur 2020
  • 30 GWS-2020
  • 30 PATA

TRAVEL INDUSTRY EVENTS

    1. GO 2020

      January 16 - January 19
    2. VAKANTIEBEURS 2020

      January 16 - January 19
    3. GRENZENLOS 2020

      January 17 - January 19
    4. MATKA 2020

      January 17 - January 19
    5. TOURISSIMA LILLE 2020

      January 17 - January 19
Get our toolbar!
Review www.travelandtourworld.com on alexa.com