Essential work starts on railway track near Dorridge

Published on : Saturday, June 25, 2016

networkrail-placeholderNetwork Rail is advising Dorridge residents of essential railway investment which will take place near their homes over the summer.The work – which forms part of Network Rail’s multi-billion pound Railway Upgrade Plan to build a bigger, better, more reliable rail network for Britain – will be carried out mainly on Saturdays to Mondays until 8 August although some mid-week work is required. Track will be removed and replaced with new railway and the ballast – the foundation that the track sits on – relayed.

In order to carry out this work a site compound will be set up on the overspill car park at Dorridge station just off Grange Road. This will mean a small reduction in parking spaces at the station for the duration of the work. In addition to this the level crossing at Mill Lane will be subject to closure on some weekends between 25 June and Monday 8 August. When the crossing is closed, a clearly-signed diversionary route via Four Ashes Road and Widney Road will be put in place. The pedestrian footbridge will remain open and in use for the duration of this work.

Martin Ball, Area Director for Network Rail said: ”We would like to thank everyone affected by the work in advance for their patience and would like to apologise for any disruption incurred. The type of equipment and machinery that we have to use to renew track is noisy which will unfortunately mean that some disruption is unavoidable. Our work will be carried out safely and we will do all we can to keep any noise and disruption to an absolute minimum.”

London Midland head of route, Brenda Lawrence said ” The train services in and out of Birmingham Snow Hill are the best performing across the whole London Midland network. The track work is essential to maintaining and improving that standard and keep travel simple and easy for our passengers. We have worked closely with Network Rail to make sure this programme causes the minimum inconvenience while delivering the benefits as soon as possible.”

 

Source:-Network Rail

Tags: ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  stumbleupon-logo   rss_logo 
ttw_blogger_logo  ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 02 wtm_london17
  • 03 itb-asia 2017
  • 12 TTF17
  • 13 Frontiers Forum 2017
  • 14 bltm 2017
  • 15 questexevent 2017
  • 16 TT Warsaw 2017
  • 17 hospitalityqatar 17
  • 17 worldmiceday 2017
  • 18 worldmiceday 2017
  • 19 Emitt 18
  • 19 IITM
  • 43 PATA

TRAVEL INDUSTRY EVENTS

Get our toolbar!
Review www.travelandtourworld.com on alexa.com