Excavation Of New Crossrail Dive-Under Begins At Acton

Published on : Saturday, November 2, 2013

Cross RailThe excavation of 34,000 tonnes of earth for a new rail underpass just outside Acton Main Line station has begun as part of works to prepare the route for the full arrival of Crossrail services in 2019.

 

The dive-under is needed so that trains leaving the Acton freight yard do not delay passenger trains heading towards Acton Main Line and on to central London.

 

Currently freight trains enter and leave the freight yard by crossing the mainline passenger tracks. The new dive-under will allow the trains to access the yard without affecting passenger services, increasing capacity and reliability.

 

The start of excavation follows nearly two years of work to re-configure the freight yard. The work on the dive-under is being managed by Network Rail and is expected to last until 2016.

 

Matthew White, Crossrail’s Surface Director said: “The dive-under at Acton is a vital part of the Crossrail works in west London, helping to ensure a fast, frequent and reliable service for passengers when full services start in 2019.”

 

Rob McIntosh, Crossrail Programme Director, Network Rail, said: “The Acton dive-under is one of the most complex infrastructure structures we are delivering for Crossrail. The new dive-under will ensure the activities of this important freight yard, which services the London network, are secured when the Crossrail services begin. The team has worked closely with principal contractors BAM Nuttall to achieve this milestone and over the coming months we will really be able to see the dive-under structure emerge.”

 

Crossrail will transform public transport, making it quicker and easier for people to get to a range of destinations across London and the South East. Residents in west London and Berkshire will benefit from new trains, frequent services and better stations as part of the project.

 

Network Rail is responsible for the design, development and delivery of the parts of Crossrail that are on the existing network. The work includes upgrading 43 miles of track as well as improving 27 stations from Maidenhead in the west to Abbey Wood and Shenfield in the east.

 

Source:- Cross Rail

Tags:

One Response to Excavation Of New Crossrail Dive-Under Begins At Acton

  1. Excavation Services says:

    Skilled excavators and modern excavating equipments can be seen in almost every reckoned construction company. They have replaced primitive manual methods of digging and plumbing. One trained man handling excavating machine is enough to take the responsibility of digging large areas of ground and that too with safely and quickly.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  stumbleupon-logo   rss_logo 
ttw_blogger_logo  ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 02 wtm_london17
  • 04 AIME 2018
  • 12 indywood 17
  • 16 TT Warsaw 2017
  • 18 TTF17
  • 19 Emitt 18
  • 19 IITM
  • 43 PATA

TRAVEL INDUSTRY EVENTS

Get our toolbar!
Review www.travelandtourworld.com on alexa.com