First Trial Run of Bangkok’s Elevated Rail System Successfully Conducted

Published on : Saturday, October 19, 2019

Bangkok Mass Transit System (BTS)’s elevated rail system, conducted the first trial run along a new stretch, on the capital city’s northern outskirts, Bernama News reported.

 

The trial run was successfully conducted from Lad Phrao Intersection station, near a heavily congested Vibhavadi Rangsit road, to Kasetsart University station, passing three other stations along the way.

 

The stretch of the BTS line between Lad Phrao and Kasetsart is scheduled to open to in December.

 

The full stretch up north to Khu Khot station, in the outlying province of Pathum Thani, which is currently under construction, is expected to open for service by the end of next year.


(No Like Yet)

Related Posts

Tags:

Comments are closed.

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  rss_logo 
ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 01 WTM 2020
  • 02 WTM London 2020
  • 06 ITB Asia 2020
  • 06 SATTE-GenX-Virtual-Expo
  • 11 i-meet-hotel
  • 12 ITE Hong Kong 2020
  • 13 IMEX 20
  • 16 FHC 2020
  • 16 G&A 2020
  • 16 ITB asia 2020
  • 16 TAAPE 2020
  • 17 GWS-2020
  • 23 emitt 21
  • 30 PATA

TRAVEL INDUSTRY EVENTS

    1. ITE Hong Kong 2020

      August 7 - August 9
    2. Hotel Investment Conference Australia New Zealand

      August 12 - August 14
    3. DRT SHOW BEIJING

      August 14 - August 16
    4. IBTM AMERICAS 2020

      August 26 - August 27
    5. UITT

      September 1 - September 3
Get our toolbar!
Review www.travelandtourworld.com on alexa.com