Queens Midtown Tunnel Manhattan Plaza Work Requires Closure Of “Uptown” Lanes For Two Months

Published on : Thursday, April 28, 2016

MTA-RailStarting on Friday, April 29, 2016, and for approximately two months, the two “Uptown” exit lanes at the Manhattan plaza of the Queens Midtown Tunnel will be closed for the first of several stages of plaza roadway rehabilitation.

 

Customers seeking an Uptown Manhattan route should use the two open Crosstown lanes.  The two Downtown exit lanes will also remain open during this period.

 

The work includes asphalt replacement, rehabilitation of pavement joints, and concrete and masonry repairs.  Demolition work will take place during daytime hours, and will comply with the New York City Noise Code. Rehabilitation of the Crosstown plaza lanes will follow the current work, and Downtown plaza lane repairs will comprise the final stages, with each stage lasting about two months. There are six lanes in the Manhattan exit plaza of the tunnel.

 

Drivers should expect some delays and plan accordingly.

 

 

Source:- MTA

Tags: ,

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  stumbleupon-logo   rss_logo 
ttw_blogger_logo  ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 01 AIME 2018 BB
  • 02 WTM Latin America 2018
  • 03 EMITT 2018
  • 04 AIME-2018 small
  • 05 itb-china 2018
  • 06 Central & Eastern Europe 2018
  • 06 imtm 2018
  • 06 TTF-2018
  • 07 balttour 2018
  • 07 ibtm arabia 2018
  • 08 mice-arabia 18
  • 09 The hotel shows audiarabia 18
  • 10 hotelfair 2018
  • 10 miceforum 18
  • 11 Digital Travel 2018
  • 30 PATA

TRAVEL INDUSTRY EVENTS

Get our toolbar!
Review www.travelandtourworld.com on alexa.com