Richmond terrace/trantor palce ramps at bayonne bridge in staten island to close november 4

Published on : Monday, November 4, 2013

The Port Authority of New York and New JerseyThe next phase of the Bayonne Bridge Navigational Clearance Project requires the closure of the Richmond Terrace/Trantor Place ramps that connect the Bayonne Bridge to local Staten Island streets. These ramp closures will begin Monday, November 4, and will remain in-place through the duration of construction.

 

 

Motorists who normally use the Richmond Terrace/Trantor Place on-ramp to access the Bayonne Bridge will now take Port Richmond Avenue south to Trantor Place to access the Forest Avenue on-ramp, which leads to the bridge.

 

Motorists traveling north on Route 440 who normally exit Route 440 using Exit 13-Richmond Terrace/Trantor Place will now use Exit 12-Forest Ave and Willow Road east to Trantor Place. Exit 12-Forest Avenue is the last exit in Staten Island before the bridge.

 

Source:-PANYNJ

Tags: , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  stumbleupon-logo   rss_logo 
ttw_blogger_logo  ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 02 wtm_london17
  • 04 AIME 2018
  • 12 indywood 17
  • 16 TT Warsaw 2017
  • 18 TTF17
  • 19 Emitt 18
  • 19 IITM
  • 43 PATA

TRAVEL INDUSTRY EVENTS

Get our toolbar!
Review www.travelandtourworld.com on alexa.com