Union Pacific Completes Railroad Spike Fastening System Replacement

Published on : Friday, October 14, 2016

Union PacificUnion Pacific completed its rail fastening system replacement work throughout the eight miles of curved track in the Columbia River Gorge. The track throughout the curves is secured with a fastening system that includes spikes instead of lag bolts, enhancing defect detectability during inspections.

 

“We have a clear focus – to safely operate our trains and protect our communities,” said Wes Lujan, Union Pacific vice president – Public Affairs, Western Region. “The fastening system replacement reinforces our commitment to rail safety in the Gorge as we strive to improve upon our 99.98 percent hazardous materials safety record and achieve our goal of zero incidents.”

 

The company has made considerable safety improvements, reducing reportable derailments across the network by 35 percent from 2000 to 2015. In Oregon specifically, Union Pacific reduced reportable derailments by 58 percent from 2000 to 2015.

 

Source:- Uprr

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

CAPTCHA Image

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

arrow2Follow TTW
 
facebook-logo  twitter-logo  LinkedIn_logo  stumbleupon-logo   rss_logo 
ttw_blogger_logo  ttw_blogger_logo  ttw_blogger_logo

ADVERTISEMENT

  • 01 AIME 2017
  • 03 itb-berlin 2017
  • 09 AITF17
  • 10 ibtmarabia-2017
  • 10 uitt16
  • 11 arabian-travel-mart 2017
  • 12 mitt 2016
  • 12 SATTE 17
  • 12 TTF17
  • 13 balttour 2017
  • 13 Digital Travel 2017
  • 14 OTM 2017
  • 15 Iran Hotel & Tourism Investment Conference 2017
  • 15 mice-arabia 17
  • 16 EMITT 2017
  • 17 exhibitionexcellenceawards 2017
  • 21 IITM 2016
  • 43 PATA

TRAVEL INDUSTRY EVENTS

More Events...
Get our toolbar!
Review www.travelandtourworld.com on alexa.com