Buses to replace trains over Easter in South London
Saturday, March 16, 2024
Favorite
In South London, significant upgrades amounting to £89 million are scheduled over Easter. This involves replacing trains with buses and implementing crucial improvements to the railway infrastructure.
Upgrade Details
- South Croydon: Whyteleafe level crossing will undergo upgrades to enhance performance and prolong its lifespan.
- Balham to Beckenham Junction: Engineers will replace switches, crossings, and wheel timber, preparing for future signaling systems.
- Brixton Junction to Denmark Hill: Installation of a new signal gantry will support the modernization of signaling systems.
Thameslink Statement
A Thameslink spokesperson highlighted the comprehensive upgrade plan, emphasizing its role in modernizing track and signaling systems dating back to the 1980s. The closure period will also witness refurbishments of switches, crossings, and vegetation clearance along the lines.
Hither Green Enhancements
At Hither Green, embankment stabilization measures, including a 115-meter sheet pile wall, will enhance railway safety and reliability. Additionally, track refurbishments and ballast replacements are scheduled.
Southern Rail Arrangements
- Lewes to Pevensey and Westham: Line closure necessitates buses to replace trains, ensuring continuity of service.
- Special Services: Limited train operations and designated bus services are arranged to mitigate service disruptions.
Sunday Specifics
- Balham to Sydenham: Southern trains suspended, replaced by London Buses, with a special London Overground service operating instead.
- Purley Routes: Various route closures necessitate alternative travel arrangements via London Bus services.
Thameslink Adjustments
- Denmark Hill Closure: Replacement bus services between Herne Hill and Bromley South are arranged, bypassing Nunhead and Ravensbourne stations.
Southeastern Changes
- Saturday Service: Trains via Denmark Hill suspended, accessible buses replace trains between Lewisham and Sidcup.
- Sunday and Monday Services: Similar disruptions with alternative bus services provided for affected routes.
Over the Easter period, extensive upgrades and necessary closures demonstrate the commitment to modernize and enhance railway services in South London. Despite temporary inconveniences, these measures aim to deliver improved safety and efficiency for passengers in the long term.
« Back to Page
Tags: buses, closures, easter, Engineering, improvements, Infrastructure, modernization, replacements, south london, Southeastern, Southern, Thameslink, trains, upgrades